A whole-home interior package succeeds when design, supply and installation are treated as one coordinated system. The first task is not choosing finishes. It is defining who decides, who measures, what will be supplied and what must be approved before production.

01

Start with rooms, systems and interfaces

List the project by room, then identify the systems inside each room: fitted joinery, doors, surfaces, lighting, loose furniture and hardware. This exposes shared materials and repeated details before separate suppliers create conflicting decisions.

The scope should also identify interfaces with appliances, plumbing, electrical work, walls, floors and ceilings. A beautiful cabinet drawing is incomplete if the service locations and installation tolerances are unknown.

  • Room-by-room scope
  • Product and finish schedules
  • Appliance and service interfaces
  • Items excluded from supply

02

Confirm the local project team early

An overseas design and supply partner cannot replace local site authority. The client should appoint a local architect, builder, fit-out contractor or installer who can confirm dimensions, local codes, site access and acceptance requirements.

Responsibilities should be written as a simple matrix. It must show who owns final measurement, drawing approval, import, unloading, storage, installation and defect reporting.

03

Prepare a useful initial brief

A complete tender package is not required for the first review. Floor plans, reference images, a room list, approximate area, target date and realistic budget range are enough to identify project fit and missing information.

For multi-unit projects, include the number of room or unit types. For private residences, identify which spaces are included and whether a local installation team has already been appointed.

04

Separate the design retainer from production payment

Project-specific design requires decisions, drawings, revisions and coordination. A written design scope and retainer should be approved before design work begins. This protects both sides from treating design as an unlimited free quotation exercise.

Production payment should follow only after the approved scope, drawings, samples, commercial terms and change rules are clear.

05

Use approval gates before manufacturing

A reliable approval sequence moves from concept direction to coordinated drawings, material samples, technical interfaces and final production release. Each approved item should carry a date or revision status.

If a decision changes after release, record the cost, programme and affected items before work continues. Informal chat messages should not become the only change record.

Frequently asked questions

Project questions

Do I need complete drawings before making contact?

No. Floor plans, a room list, reference images and an approximate budget are enough for an initial review. Missing technical information can then be identified.

Can one supplier coordinate the complete interior package?

Yes, if the scope, interfaces, approvals and local responsibilities are documented. Coordination does not remove the need for qualified local measurement and installation.

When should the design retainer be paid?

After the initial project review and written design scope are accepted, and before project-specific design work begins.

Discuss your project

Send the information you already have.

A floor plan, BOQ, reference image or short brief is enough for an initial review.